Описание:
Самый популярный, надежный и недорогой бизнес-джет в истории авиации.
7 мест
Оборудован и сертифицирован для полетов IFR
Ангарное хранение
EU-OPS
Есть вся история повреждений.
Airframe
Serial Number: 500-0081
Total Time Airframe: 6475
Landings: 6690
Engines:
Left Engine Pratt & Whitney JT15D-1A Hours: 9920 Hours / 11004 Cycles, 3099 SMOH (3500 TBO)
Right Engine Pratt & Whitney JT15D-1A Hours: 4709 Hours / 4599 Cycles 2282 SMOH (3500 TBO)
Avionics
Garmin 530AW (8.33Mhz and FM Immunity)
Garmin 430AW (8.33Mhz and FM Immunity)
1 Collins DME-40
2 ADF60A
Mode S Transponder Garmin GTX330DES
2 Mode C Transponder Rockwell Collins TDR-90
Radio Altimeter Rockwell Collins ALT50
Weather Radar Bendix King RDR-1200
Gps Garmin 530AW and 430AW
Elt Kannad 406
Flight Director Autopilot Honeywell FGS 70
RMI AVI200
Marker Beacon KMR-675
Additional Equipment
1 Angle of Attack System
2 Sierra Radome Modification
3 Fan / Turbine Syncro
4 Instrument Panel Cooling Fan
5 Cabin Writing Tables
6 Two Clock
7 JT15D-1A (102.1%) Authorisation
8 COM1 Frequency change on pilots Yoke
9 Cabin Signs and Chimes
10 Emergency Locator Transmitter
11 Refreshment centre with Bar, as a spare
12 Pick proof locks and locks at radome
13 Emergency equipment: Two halon fire-extinguisher, 9 life vest and PBE
14 Oxygen system (60 cubic feet)
15 Monorail Sunvisors
16 GILL Lead acid Battery
17 Rear couch seat option
18 Toilet on board
Interior
luxury interior with Blue leather seats. Blue wool carpeting and ultra
suede headliners manufactured by Poltrona Frau.
6 Place of Seat with 1 place aft seat with a flush potty sofa creates a roomy, comfortable
and functional environment for 7 adults.
The interior includes a refreshment centre with bar as a optional, Also a right hand drawer
under one seat and cabin writing tables at the club seats. In the cockpit have a monorail
sun visors.
Exterior
White and blue stripes paint. 8/10
Remarks:
Fresh Phase 5 just completed!!
Fresh Phase 1-2-3-4-B just completed!!
P-RNAV and LPV Approved
Operated under German AOC
SierraTrax Maintenace Tracking Programme
ARC due 02/2022